要求:最低文憑/LCCI。至少2年相關領域工作經驗,有建材背景者佳。具備ISO品質管理系統經驗者優先考慮。歡迎應屆畢業生申請。職位描述:每日將收貨單(GRN)輸入系統,檢查交付貨物的�
要求:
- 最低文憑/LCCI。
- 至少2年相關領域工作經驗,有建材背景者佳。
- 具備ISO品質管理系統經驗者優先考慮。
- 歡迎應屆畢業生申請。
職位描述:
- 每日將收貨單(GRN)輸入系統,檢查交付貨物的數量和規格以及供應商收取的費用。
- 執行日常採購操作,核對送貨單與採購訂單和發票。
- 掃描收據和發票到系統。
- 核對每月帳戶報表,並編製每月供應商對帳單。
- 與供應商溝通付款/發票事宜。
- 與現場團隊協調,確保所有出貨訂單均有正確記錄。
- 妥善歸檔及維護採購記錄、報價單、供應商資訊及其他相關文件。
- 監控供應商的交貨情況,跟進並催促供應商按時交貨。
Beginning as a sub-contractor
The Group started from a humble beginning in 1996 as a sub-contractor. With a vision that the Malaysian construction industry would grow exponentially as the country progress, the Group persevered through difficult periods and successfully transformed the Company into a prominent player in the construction industry.
Attained the CIDB G7 License
In 1999, Pesona Metro attained the CIDB G7 license. Since then, the company grew from strength to strength, starting from its first drainage project exceeding RM5 million in Putrajaya, and many more projects followed suit. One of Pesona Metro’s fortes is in the reconstruction and rehabilitation of rivers which won the company a string of awards and recognitions from the construction industry.
First Main Contractor for "Design and Build"
In 2002, we secured our first job as the main contractor for the “Design and Build” project for the Rehabilitation and Beautification of Melaka River (Phases 1, 2 & 3) with a contract value exceeding RM234 million. This project was completed as scheduled and has set a new milestone for Pesona Metro for it was awarded the prestigious Pertubuhan Arkitek Malaysia (“PAM”) Award in 2009 for Category 8 (Special Category). It also won the Special Award for National Contribution in 2011 in the coveted FIABCI Malaysia Property Award. These accolades testified Pesona Metro’s reputation as a builder of timely delivery and exceptional quality.
"Design and Build" for Timah Tasoh Dam
In 2006, Pesona Metro secured the construction of Zehn Bukit Pantai in Kuala Lumpur, which was a two-block 25-storey luxurious condominium. Other prominent projects completed by Pesona Metro include Suruhanjaya Pilihanraya building, Sastra U-Thant Luxury Condominium, the Realignment and Rehabilitation of 3.7km Sungai Kerayong in Kuala Lumpur, Design and Build project for the Timah Tasoh Damn in Perlis and other road and bridge works in Terengganu.
Listed on the Main Market of Bursa Malaysia Securities Berhad
In 2012, Pesona Metro Holdings Berhad was listed on the Main Market of Bursa Malaysia Securities Berhad (Construction Sector).
As the Group continues to grow, it has ventured into other complementing businesses that bring recurring revenues. It acquired Pesona Saferay Sdn Bhd that manufactures PU products that are used for interior and exterior façade applications, and also PM2 Building System Sdn Bhd that produces modular partition panels which is an excellent replacement of conventional bricks.
In summary, over the short span of two decades, Pesona Metro has morphed into a prominent and sustainable builder, with a reputation for quality works that continuously adds value to its stakeholders.